Roof refurbishment
The customer wanted to place photovoltaic panels on a large part of his roof, he was advised to renovate the waterproofing before installing them. A Sikaplan membrane was placed and mechanically fixed on the steel deck support for the storage warehouses, while the SGK membrane was applied in bonded installation on production areas with relatively high ambient humidity. The challenge for this project was undoubtedly the very short completory time.
Materials :
Membrane : 14 000 m2 Sikaplan 1,8mm + 8000 m2 Sika SGK 1,5mm