Back to projects
Tunnel de Cointe

Tunnel de Cointe

Liège
2000
YEAR
of realisation
28.000
of roof
BITUME
APP
4mm

Project description : Tunnel de Cointe

Waterproofing of the road-supporting slab of the motorway tunnel and tunnel exit structures
This work was to seal the concrete slab under the road surface. Under this concrete slab is where, in particular, all technical ducts and vents are situated.

 

Material
4mm APP bitumen