The general contractor Willy Naessen called on our know-how for carrying out roofing of the new commercial premises on the Ikea store site in Arlon.
This construction with an initial duration of 3 weeks was in fact conducted in several phases. Throughout the construction, the manager coordinated with the general contractor in order to meet the specific phasing requirements for this construction.
Materials :
Vapour barrier, 100mm PIR insulating and 1.5mm TPO Sika membrane