The main contractor who was commissioned to deliver this ambitious project commissioned us to carry out the entirety of the roofing and cladding works, involving a range of techniques and materials. The main contractor was allocated a total time period of ten months to complete the whole project. It was vital that it selected highly professional subcontractors, who could meet its complex requirements. The project was delivered on time, with the client very satisfied; and as a result, we have been selected to work on numerous other projects.
Material and description
PS 200 SE + double-layer bitumen 9,000m² EPS + PVC (Decathlon) 4,000m²
Double-skin metal cladding on concrete frame: 5,100 m²
Metal cassettes: 1,300m²
Steel deck: 13,000m²
Two-layer bitumen sealing: 9,000m² + Sikaplan PVC Waterproofing 15G: 4,000m² (Decathlon)