As with each IKEA site, the deadline was a major challenge. These were works of a considerable size, to be carried out over a winter period, to which the complexity of a range of materials was added. Despite these challenging circumstances, we completed the works to the considerable satisfaction of the main contractor we worked with.
Material
Steel deck: 22,000m²
PIR sandwich panels on concrete structure: 7,000m²
Aluminium cassettes: 1,200m²