28/08/2017
The Wust-Eloy joint venture called on our services to cover and insulate an initial 42,000m² warehouse for Jost Group’s logistics.
The challenge for this site was the 8-week time-frame allowed for all our work, i.e. 5,000m² a week.
Our workers installed a PE vapour barrier on the steel roof-decking support, a 180 mm EPS insulation and, to finish off, a Sika 15G membrane.