05/09/2017
A 6.000m² extension of the B16 building to double its floorspace, at the request of our customer Wust.
As the building is used for storage, there was no need to instal a vapour-barrier. So we insulated with 120mm EPS with fibreglass and fitted a 15G membrane.
Timescale for our intervention: 2 weeks.