Back to news Realization of roofing and insulation Hall B16 – Liège Airport

05/09/2017

Hall B16 – Liege Airport

Extension hall B16 Liège Airport

A 6.000m² extension of the B16 building to double its floorspace, at the request of our customer Wust.

As the building is used for storage, there was no need to instal a vapour-barrier. So we insulated with 120mm EPS with fibreglass and fitted a 15G membrane.

Timescale for our intervention: 2 weeks.