Back to news Carrying out waterproofing and insulation of the MD roof in Waremme

02/10/2023

Carrying out waterproofing and insulation of the MD roof in Waremme

Construction of the MD roof in Waremme

Our teams carried out the insulation and waterproofing work on the industrial roof of MD Waremme, with an area of ​​2,500 m². The roof is made up of two parts:

The first part includes a P3 bituminous vapor barrier, 160 mm thick EPS insulation covered with a glass veil, Sika SGmA-18 waterproofing and 8 cm of vegetation with a rolled gravel traffic area.

The second part includes a P3 bituminous vapor barrier, 160 mm thick EPS insulation and Sika 15G waterproofing.

Contact us